Wednesday we drove to Charlotte, NC and obtain a new front door with side lights at the Habitat for Humanity Store. That will be the first item that we have the trim carpenter install once he arrives on site. Brent has installed about 90% of the black marble in the foyer. He did not install the last three (3) feet to the door incase there is damage to the subfloor and new framing is required. Lynn has grouted on the tile and it looks great. Jennifer has painted the hall closet door, the refurbished fireplace mantle for the keeping room and trim pieces. Jessica has attacked the stairway and has been painting some of the steps and risers.
Here is a picture of Lynn installing the grout between the marble. It was like black ink.
We also have put down the frame work for the hearth in the keeping room and the girls painted the fireplace mantel which be installed in the master bedroom sitting area. Our electrican has showed up the past few days, including today, and is almost finished installing the undercabinet lighting.