Sunday, February 28, 2010

Weekly Update

We stayed in Maryland and continued to empty boxes (and make many trips to the Goodwill Store) this weekend and did not travel down to work on Zelda.  We hope to have work started on the deck soon and completely finish all the inside work.

Wednesday, February 24, 2010

Mission Accomplished

Our goal of having the bathtub tiled in the upstairs hall was achieved over the weekend.  We also finished the last little bit of flooring in the master bathroom shower and three more rows of marble in the foyer.  The flooring and the trimwork looks great.  We will need to contact our trim carpenter to install the shoe molding, and finish a few other areas.  Our cat was still there and showed up for a few meals.  Below are some photos taken.


The dining room (above) and keeping room looking from kitchen (below).

No dumpster or old deck.

The keeping room looking from bottom of stairs.

Dining room fireplace looking into keeping room.

The grout to be installed next trip.

The new tilework for the bathtub area. 

Tile installed in a subway pattern.


The keeping room fireplace.

The two (2) above photos of the front den/living room.

The front den/living room fireplace.

The two (2) above photos looking from den/living room into foyer.

The foyer floor near the front door eary Sunday am.

Marble tile floor in foyer nearly complete.

In keeping room facing the stairs.

In keeping room looking through left dining room entrance.

Looking from keeping room into kitchen.

Thursday, February 18, 2010

Heading South to Zelda

We are still upacking boxes in Maryland, but will make the trip down to Zelda Friday evening.  We will take lots of pictures and this will be the first time we have been to Zelda since the wood floors and all the trim work has been finished.  Our goal is to finish tiling around the bathtub in the upstairs hall bathroom.  We will start the process of obtaining a real estate agent soon.