Backer board placed on the floor in the foyer.
On Saturday, we finished installing all the backerboard in the foyer, so now we may begin the installation of the black marble. We also got all the remaining crown molding at Lowes (about 300 lf) and the girls applied two (2) finish coats to all the molding. Brent was able to contact our potential trim contractor and he agreed to meet us on Tuesday. Lynn continued with the stairs and we also hooked up the gas to the dining room fireplace. Around 6 pm we finished work and headed over to Raleigh, NC to Renee and Greg's house.
Jessica painting the spindels and the stairway.
The dining room fireplace lit. Our stray cat "Socks"
Lynn falling through a chair after eating a "heavy" lunch. More of the backerboard in foyer.
The girls painting crown molding and another picture of the stairway in the foyer.