Pathway - Front to Back

Now there is a continuous sub-flooring from the back of the house to the front wall. Brent was able to install some sub-flooring sheets in the dining room and reached the front wall.

His prep work took about an hour as he installed the chicken wire between the floor joists and then the installation. He is also using liquid nails and then screwing the sub-flooring to the joists.

The next accomplishement will be to have the subfloor from side to side.