Friday, November 6, 2009

Final Kitchen Floor Tile Is Placed


The remaining three days of the week were not as exciting as seeing the results of putting on the primer. We scraped, caulked and repaired the side of Zelda. It took two days and we still need to apply some more caulk next week. Brent was tired of putting on caulk, so Friday, we finished the tiling the kitchen floor.

We are close to installing the stackable washer and dryer in the downstairs laundry room. The only missing item is the clamp to attach the exhaust vent to the dryer. Next week we will be able to wash and dry clothes.

Cookie worked hard all week and was very tired. The picture of her is a break she took on top of the wood flooring. We have 27 boxes remaining to be picked up at Lowes. We headed back to Gatlinburg Friday evening and met the girls. Jennifer and Jessica are taking Brent to the Tennessee football game Saturday night. Go Vols.

2 comments:

  1. Looks like you have scored two good mantels on Craig's list. I can not wait to see the finished product.

    ReplyDelete
  2. Cookie needs to get to work.

    ReplyDelete