Sunday, June 21, 2009

Some Lights Have Been Hung

Brent drove to Kings Mountain from Gatlingburg and Lynn and the girls, including Cookie, from Raleigh. We are selling the house in Holly Springs, so Lynn and the girls were supervising the packing and loading. Also, a few wedding details are being wrapped up. Greg's wedding is now only one week away.
The electrican worked some this week and hung about half of our lights. The two period lights were installed in the downstairs foyer and look fantastic. Two of the bedrooms have the ceiling fans installed and the light over the kitchen sink has been installed.
I did not think this would happen, but our electrican actually made more headway during the past couple weeks than Ray.
No additional work was performed on the trimwork upstairs.
Brent did finish a few floor tile items in the master bath room and did set the first row of wall tile in the downstairs bathroom shower. Brent will continue with the shower on Thursday when he stops and works for the day prior to heading to Raliegh for the wedding. All of our family will be stopping back to see Zelda next Sunday on our way back to Gatlingburg.

We had some more excitement on the way back home this week. It appears the power stearing pump has gone out in the truck and we were lucky to be near a market in Cosby. Power stering fluid was all over the inside of the engine compartment and leaking on the parking lot. We will need to get the truck towed on Monday and brought to a garage.

No comments:

Post a Comment