Sunday, March 8, 2009

Tiling Work Begins

Well, we travled once again from Tennessee back over to Kings Mountain, NC this weekend to work on Zelda. In the downstairs bathroom, Brent preped the the shower basin and installed cement board on the floor and began tiling. He finished the shower basin and about three-quarters of the bathroom floor. He was unable to finish, because we still need to intall the hvac vent and the final location will be determined by the location of the floor joists from craw space.

Brent also met with our new hvac person, who is pulling a new permit and wil be installing two (2) new ac units, new ducting upstairs, dryer vents and new some new ducting downstairs for vents. He is also going to inspect the existing ducting and make any required repairs.

Lynn continued painting and finished all the priming in the entire house. She also finished several more ceilings but ran out of paint to complete the job. Looks like we will need a few more gallons to complete the job. Lynn then started cleaning the upstairs.

We will attach pictures next week of the bathroom and updates on the house. Don't forget to vote for your favorite season in our poll. Funny but on Sunday back at the house in Gatlinburg, we received about six inches of snow and Cookie really loved it.

No comments:

Post a Comment