We went to Zelda on Saturday, to finish the upstairs exterior wall insulation and to install a glass block window in the master bath. We were unable to find the mortar for the the glass block so we only were able to finish the installation of the insulation. Brent did do some framework for the upstairs hvac return. The Workmans are really doing a great job on the sheetrock. The downstairs is nearly finished with only a few spots remaining. When we arrived, sheetrock was being applied to the ceilings upstairs.

As promised, we have attached some pictures. The arched doorway at the bottom of the stairs was a surprise by Ray.










Next week we hope to finish the glass block window and prime the walls and ceilings downstairs.