Wednesday, January 23, 2008

Past the Six Month Milestone Post

We have now passed the sixth (6th) month milestone and still no kitchen cabinets installed. We purchased these back in August on sale, and I keep having to move back the delivery date and now it has moved back to the end of March 2008.

Brent has taken a work break such that he is having to work on his real job all week and is now limited only to working at Zelda on the weekends. Not to fear as he has the majority of all the prep work finished for the electrican. The electrical work did start this week with an anticpated finish time of two (2) weeks. We expect that time period to double if not triple. Once finished, we can then have the sheetrock installed and then the kitchen cabinets.

Brent has installed all the headers over the doorways on the first floor including the header dividing the kitchen and keeping room. He had to have Ray and his father to install the LVL header as is was too heavy to install alone. The open space downstairs looks great.