Friday, December 14, 2007

Signs of Improvement

Improvements all around. First, Lynn's dad has improved somewhat and was moved back into a private room. Current situation is that the doctor told Lynn that his current condition is not life threatening, but he his clearly not out of the woods.

The subflooring is nearly complete in the library/formal living room. Looks like the hvac contractor is showing up today to finish hanging all the duct and install the gas pack unit. Now Brent can finish all the flooring and begin demolishing the ceilings. After the demo, he will inspect the underside of the second story floors and brace/strengthen as needed.

Our contractor that installed the piers and leveled the house is now repairing the fireplaces and installing a brick wall with manway door between the foundation piers. The bricks and sand were delivered yesterday and work is to begin today.
The siding was delivered on Thursday and Ray (our roofing contractor and neighbor) will begin installing the siding today. Brent sill has some windows to install that will impede the progress.

Two (2) electrical contractors have confirmed appointments set for Tuesday, December 18th to view the house and prepare bids.

There are alot of irons in the fire but we are hopefull as the progress is noticeable.

No comments:

Post a Comment