Included below are some pictures of the dormer taken on the first look at the house back in May of 2007. I like the change.

Tuesday, November 6, 2007
Change in Front Dormer
Monday, November 5, 2007
Screwing Around at Zelda
So the weekend was spent installing the flooring and insulation. After some trail and error the best way to install the insulation turned out to be chicken wire. Yes -- chicken wire. Brent purchases the wire in 24" width and the cuts the length to fit each of the spaces between the floor joists. He makes a basket out of the wire for the insulation to lay on. The chicken wire is attached to the joists using a pnuematic stapler and 1" long staples. At first Brent was installing 4 foot wide sections from the bottom but found out it was easier to install the wiring from the top. With the insulation laying in the chicken wire between the floor joists, it looked more like an attic than it did a floor.
Friday, November 2, 2007
Three and One-half Months
We are now closing in on our fourth month of work and ownership of Zelda. Brent's parents are arriving this weekend and were warned to bring their work clothes. Brent is going to start laying down the subfloor and his dad will operate the new drill, which has an extension and automatic screw feed to not make a person's back sore.
The plumbers were at the house today and installed the gas line. Brent was called to set-up an inspection with KM for Monday. Below are two pictures that show the current status of the back of the house and the before. Just a little bit of difference.
The work was performed by the roofing contractor, which is a family owned business, who live in the neighborhood and do framing, roofing and sheetrock. 

Subscribe to:
Posts (Atom)