We were singing that ole Herman Hermit's song, with a slight change as we finally have a working toliet at Zelda. With the operational toilet, Lynn and Brent spent Saturday night at Zelda. Yes we worked all day and into the night on Saturday and then put half a day of work on Sunday, before heading back to Gatlinburg.
Attached are photos from all three (3) bathroom floors. Worked accomplished this weekend included, Brent installing the toilet downstairs, Lynn grouting the upstairs hall bathroom floor and Brent prepared the master bath floor and started installing tile. He is using a basket weave pattern for this floor. Lynn cleaned out Zelda and our electrican showed up and will continue to work this week. We are actually planning to have lights, fans, outlet and light switches installed this week.