This weekend was a quick, one day trip to Zelda on Saturday. Brent arrived around noon to review the electrical progress and meet with the electrican. Work is steady and at the end of the day, we have the canned light fixtures installed in the kitchen and bathrooms. The rough-in of the electrical is still about one (1) week away, so Brent says it will be two (2).
The current goal is to have the electrical work inspected and approved in April, such that the sheetrock work can begin during the month of April. Brent still has no odds and ends to make sure that all the nailers are up prior to the sheetrock being installed. Of course, there are still nails, nails and even more nails to remove from the studs, ceiling joists and floors.
We sure hope that everyone had a great Easter and even if you were not able to spend the day with family, that you did remember the reason for the day and the Grace we received.
No comments: