The original kitchen with a pass through. July 2007 |
Another view of kitchen. The pass through is to the left and the stairs are located through the door on the right. July 2007 |
Looking through kitchen door towards the sink. July 2007. |
Looking at kitchen pass through. The drop down ceiling in keeping room is removed. July 2007 |
The demo of the wall with kitchen pass through. July 2007 |
The kitchen pass through is gone. July 2007 |
The interior walls of kitchen have been demolished. August 2007 |
The debris on the kitchen floor. August 2007 |
Cleaning up the wall insulation. August 2007 |
The floor are gone and the dirt floor is showing. Three piers were poured to support the new floor and main beam is installed. September 2007 |
Brent and Tommy attaching the new floor joists to the main support beam and sides. September 2007 |
The treated floor joists are attached using joist hangers and are on 16" spacing. September 2007 |
Almost half the kitchen floor joists are installed. September 2007 |
The kitchen floor joists are installed. September 2007 |
The hvac ducting installed and the floor insulation is being installed. Also we installed a black poly sheet on all the dirt below Zelda. November 2007 |
Brent's dad is helping to install the chicken wire to hold the floor insulation. November 2007 |
With Pa Pa Neals help the kitchen floor insulation is installed and the 3/4" T&G flooring (on right) is being installed. November 2007 |
Another view of the kitchen sub flooring. The saw horses with the door became the work bench for several years as work was perfomred at Zelda. November 2007 |
WOW!!!!!!!
ReplyDeleteUnbelievable !!!!!!!!!!!!!!!-----So glad you took so many pictures.-----
ReplyDelete