Brent also installed an outside casing (frame) around the glass block window in the master bathroom. The window is over the jetted corner tub. We did not take a picture of the outside window framing. Other items not shown include installing the threshold on the back exterior door.
Now that the dormers have been painted, the walk boards will be taken down.
The new updated picture for the blog header.
A side view from the driveway of the back deck.
The door on the right off the back deck leads into the laundry room then into the kitchen. The double doors on the left lead into the downstairs bedroom (The Murphy Room).
No comments:
Post a Comment