Also during the weekend, the keeping room fireplace was tiled and grouted, the back door stairs were stained and final touches were made downstairs on trim painting and caulking.
We have traveled down to Zelda five (5) out of the last six (6) weekends, so we are taking this weekend off.
Jennifer staining the back steps and Inspector Cookie looking at the work.
Still working on the stairs.
Inspector Cookie moves into the dining room to inspect the installation of quarter round.
Painting the stairs and applying caulk to the door trim.
Jessica painting the stair risers.
Jennifer applying caulk.
Socks shows up for a free meal.
Inspector Cookie looks at the keeping room fireplace.
The fireplace hearth and surround grouted.
The master bath grouted.
Inspector Cookie takes a shower before giving her final grade for Zelda.
Inspector Cookie agrees with the City of Kings Mountain and gives Zelda a passing grade.