Sunday, March 22, 2009

Painting and Tiling

Brent met Lynn, Jennifer, Jessica and Cookie at Zelda on Saturday to continue work. All the girls had been in Raleigh, NC to visit Greg at his apartment. Jennifer and Jessica were off the week from classes at UT due to spring break.

Well, Brent finished tiling the floor of the downstairs bathroom and was able to level and lay all the cement board for one of the upstair bathrooms. Lynn finished painting all the ceilings while Jennifer and Jessica put the final coat on all four upstair bedroom walls.

Also during the trip, our electrican met with Brent and will start the final phase of the electrical work. We will have to get the cabinet installer to return because the garbage disposal and dishwasher outlets were covered up when the dishwasher was relocated during the cabinet installation.

Brent is currently on the look out for solid wood flooring on sale. We will need about 1300 sf because we will tile the kitchen, laundry room, walk-in pantry and all the bathrooms. The original woodfloors upstairs will be salvaged by some repatr, sanding and staining.




No comments:

Post a Comment