Well it has been a few months since our last posts. We have been busy attending Tennessee Vol home football games and working on Zelda. It does get old thinking about making the trek from Chattanooga over to Zelda, but once there it is enjoyable.
The downstairs has been completely sheetrocked, sanded and primed. In fact, all the ceilings downstairs have been primed and ceiling paint installed. Only the hallway and the Murphy room have not received thier final coat of paint.
The only item still needed to be sheetrocked is the inside of a closet housing the return air duct. The duct still needs to be finished, but our original HVAC contractor has skipped town with our money and without finishing the work and he stole our 4 ton gas pack unit. We are currenlty looking for a replacement to finish the work.
The good news. Our kitchen cabinets have been installed and look great. The crew did a great job and they are currently 95% finished. A few spacer pieces were back ordered so they will finish next week. The original install date was November 1, 2007. Only one (1) year behind schedule.
Our next mission is to start on one (1) of the bathrooms and have in operating.
Hope everyone has a great Thanksgiving.
No comments:
Post a Comment