The dumpster has been emptied and moved to the front of the house as demolition of all the interior walls and ceiling on the second floor will begin today. It will be similar to the downstairs demo as all the interior and exterior walls will be down to the studs. Sheetrock will be used to replace the heavy plaster. Brent has hired this work out as he as decided to complete the entire electrical work for the entire house instead of working in two (2) phases. The siding on the new portion of the house has been completed and looks great.
Brent needs to finishing stiffening the underside of two (2) upstair room floors as the electrical work could begin next week.