After the Thanksgiving Holiday break, Brent has resumed work at Zelda. After returning from East Tennessee, he finished removing the remaining aluminum siding and installed the OSB and housewrap. During the break, the Kings Mountain utility department, moved the electrical connection from the side of the house to the temporay pole. Once relocated, this allowed Brent to finish. He also installed the framework for three (3) additional windows. On Monday night, he installed the final chicken wire in the dining room for the installation and two (2) more sheets of subflooring. He expects to finish the dining room subflooring by Wednesday night.
Also, a contractor is working on our fireplaces inside to strengthen them and make them ready for the gas inserts. The same contractor will also install an additonal pier outside to support the pantry addition overhang.
Expect some pictures tomorrow once they are available.