Tuesday, September 18, 2007

All Work - No Need To Watch The Game

SATURDAY - SEPTEMBER 15th

In preparation of the plumber, Brent finished framing the masterbath shower wall and we decided to move the claw foot tub upstairs to the bathroom at the end of the hall. There is one problem, it will not fit. How do you make it fit? The bathroom has been demolished and Brent will increase the size of the bathroom by two (2) feet. The extra space will be taken from the hallway.
But, by adding space to the bathroom, this now means having to relocate the door to the master bedroom. So, more demolition was required. Then to remove the tiled shower in the bath, access was gained by demolitioning the wall in a spare bedroom (we really loved the lime green walls). On Saturday, we demolished all the needed walls and ceilings and would return the next day to clean-up the remaining debris and remove the shower basin. We arrived around 8:00 am and returned to the rental house at 8:00 pm.

The majority of the demo work is finished. We were able to complete more work today than expected, because the Vols got stomped hard and there was no reason to watch on tv.













No comments:

Post a Comment