Wednesday, November 18, 2009

Like the Weather, Plans Change

The good weather has turned and on Wednesday, it started raining and turned cool such that all the planned outside painting had to be changed. Instead, Brent has continued to work on putting down the slate tile in the master bath shower and install the second vanity in the master bath room. Lynn has continued to work on the mantle and has put a first coat of paint of the side of the stairs. It looks great.

Brent was able to get the ladder from Ray Jr on Monday evening and used it to reach the peak of Zelda on the west side. He was able to caulk and repair the siding as needed and he painted the window. He also was able to apply the finish coat on the courtyard and the back of Zelda.

Lynn was able to use a paint brush and apply the finish coat on the bottom portion of the front of Zelda.

We are heading back home Thursday evening as the girls will be home on Friday to celebrate their 20th birthday.
This is the west side after caulking and repair work.

Monday, November 16, 2009

Almost All Primed

On Saturday we looked at the forecast for Kings Mountain, NC and decided to head over on Sunday evening to take advantage of the nice weather forecasted for the start of the week. We are having to drive through Cherokee, NC because I-40 between Asheville, NC and Knoxville, TN is still closed due to the rock slide. It is not expected to be cleared for several months.
While on our drive over Sunday, we stopped and got boiled peanuts in Cherokee and apple fritters at the Barber Orchard just outside of Waynesville, NC. This orchard makes the best apple fritters, turnovers and pies, such that on the way home, we have been ordered to purchase an apple pie for Thanksgiving.

Decide to show a view of what it looks like to stand at the bottom of the ladder and look up to the top of Zelda.



















Well, today (Monday) at Zelda we were able to prime the west side of Zelda. All but the very top has been primed and Brent will need to get the ladder from Ray, Jr. to reach this point. We also started to apply the finish coat on the front of Zelda, but Brent ran into a problem of applying the paint too thick with the sprayer. There is not a lot of difference in color between the primer and the finish coats, so he moved to the back of Zelda, in the bright sunlight, and finished the entire back with the finish coat. Brent plans to paint the east side and front on Tuesday.

Lynn continued to work on stripping the mantle, painted the lower level of Zelda, did some minor grouting of areas in the master bath and stove area and did some touch up painting inside.





Friday, November 13, 2009

Rain and Chilly

This was not a good week to schedule work such as painting outdoors at Zelda. It rained and was chilly the entire week. The only day it did not rain was Friday, so Brent finished caulking the west side of Zelda. It was too windy to paint, so no painting was performed this week.

We did rearrange our work schedule and moved all activities inside. We now have a working washer and dryer downstairs which has been used more than once. We also have a working kitchen sink with garbage disposal and the dishwasher has been installed. One of the two (2) master bathroom sinks is not operable and about 1/3 of the master bathroom shower flooring has been installed.

Lynn grouted the entire kitchen floor and removed all the old paint off one of the original mantles that we had in Zelda. On one of our trips to Lowes and Home Depot, we discovered some marble tile on sale. Brent bargained with the manager and took all the remaining marble ( 170 sf) at $2.00 per square foot. This was about 60% off the original price. The marble is a black with white grains and will go in the entrance foyer.

With the rain gone on Friday, Lynn went by Lowes and picked up all the remaining 37 boxes of hardwood flooring that we had purchased in the summer. For some reason Lowes did not want to store our flooring anymore after we had them hold our kitchen cabinets for over a year. Go figure. The total amount of boxes of wood flooring is 75 with each box containing 20 sf. The total boxes of marble we purchased was 22 with each box containing 10 sf.