Well the fantastic four plus Cookie, traveled back across the mountains from Gatlinburg to Kings Mountain. Our electrican continues to make steady progress and has called for the inspection this week. Yes I said he as called for the inspection this week. He was able to install the sconse over the stairway.
Brent reinstalled the kitchen sink cabinet and placed the farmers sink in the cabinet, as our granite countertop installers will be coming to Zelda on Tuesday to take measurements. The sink is an apron style that is stainless steel which matches all the appliances. We also received our pot filler faucet that will be installed after the back splash is completed.
No additional work has been performed on the trim work as the Workman are busy with roofs in the area. Hopefully rain will enter the area for a settle in for a spell.
Brent finished the downstairs shower. He was never happier to complete a project than that shower. He really does not want to use the small tiles again, but I am sure he will change his mind as time passes. Lynn will have the fun job of removing the mortar between the tiles and the grouting next weekend.
The twins worked and completed the painting on the front two (2) bedrooms. This includes all the doors, walls and taping and painting all the trim. We have crown molding in every room and baseboards. The taping is time consuming but is worth the effort. Then when finished with those rooms, they started on the master bedroom.
Lynn finished grouting the masterbath room floor and then started painting all the walls. Next week the trim work will be attacked.
We are always thankful for a a safe ride over and back and look forward to more improvements and progress on Zelda.