Sunday, September 7, 2008

September 6, 2008

We made the trip to Zelda for the 3rd straight weekend. Ray Workman had called the KM inspection department during the week and the upstairs exterior wall insulation passed. So, we had no insulation to install. YEA!!!.

The sheetrock installation work continues upstairs with the ceilings installed and now some interior and exterior walls. Lynn worked on painting the kitchen ceiling and walls, while Brent installed the glass block window in the master bath.


We did not bring the camera so no new pictures, but I will include a recent picture which shows the cabinets in the middle of the kitchen.

Monday, September 1, 2008

Aug 30, 2008 - Sheetrock & Insulation

We went to Zelda on Saturday, to finish the upstairs exterior wall insulation and to install a glass block window in the master bath. We were unable to find the mortar for the the glass block so we only were able to finish the installation of the insulation. Brent did do some framework for the upstairs hvac return. The Workmans are really doing a great job on the sheetrock. The downstairs is nearly finished with only a few spots remaining. When we arrived, sheetrock was being applied to the ceilings upstairs.

As promised, we have attached some pictures. The arched doorway at the bottom of the stairs was a surprise by Ray.










Next week we hope to finish the glass block window and prime the walls and ceilings downstairs.